Heathrow Substation 305 |
This album doesn't contain any items
|
|
Client |
BAM Nuttall |
|
CCS Package |
CCS Facades remit was to clad the superstructure in horizontally oriented panels using the Kalzip FC Façade system. Additionally, waterproofing was installed to the roof by way of an Alwitra single-ply membrane system finished with a bespoke aluminium coping. |
|
Value |
£85,000 |